Summary
Overview
Work History
Education
Skills
Software
Guitar player
Timeline
Generic
Farzad  Jafarpour

Farzad Jafarpour

Electrical Engineer
Budapest,BU

Summary

Experienced electrical engineer with more than 20 years of expertise in the manufacture and production of power distribution and control panels. Proven track record of designing, testing, and implementing electrical systems to meet client specifications and industry standards. Skilled in project management, team leadership, and problem-solving. Strong knowledge of electrical engineering principles, codes, and regulations. Seeking a challenging role in the field of electrical engineering to utilize my skills and experience for the benefit of a dynamic organization.

Overview

15
15
years of professional experience
4
4
years of post-secondary education
3
3
Languages

Work History

(FAT) TEST of Electrical Switchgear Panels

INFOWARE ZRT. Ministry Of Electricity KUWAIT Proj.
Szigetszentmiklós, Határ Út 22, 2310 Hungary
2024.02 - 2024.02

I was present in this project on behalf of the employer as a project inspector and responsible for the FAT test. The duration of this test was 3 days and it included the following: (According to the standard IEC 60529)

1-VISUAL CHECKS

2-MECHANICAL CHECKS

3-DIELECTRIC TEST (2500 VDC / 1Min)

4-FUNCTIONAL TEST

5-ELECTRICAL CHECKS

(FAT) TEST MV Electrical Switchgear Panels

KKS-SICIM LLP-Project (KEP1) Schneider Electric
Kunszentmiklós, H-6090, Hungary
2024.01 - 2024.01

I was present in this project on behalf of the employer as a project inspector and responsible for the FAT test. The duration of this test was 2 days and it included the following: (According to the standard IEC 60529)
1-VISUAL CHECKS
2-MECHANICAL CHECKS
3-DIELECTRIC TEST (40,000 VAC / 30Sec.)
4-FUNCTIONAL TEST
5-ELECTRICAL CHECKS

(FAT) Schneider Elec. PROCEDURE FOR LV BUSDUCt

QATAR GAS EPC For North Field Production Sustaina
2024.01 - 2024.01

I was present in this project on behalf of the employer as a project inspector and responsible for the FAT test. The duration of this test was one days and it included the following: (According to the standard IEC 60529)
1-VISUAL CHECKS
2-MECHANICAL CHECKS
3-DIELECTRIC TEST (2500 VDC / 1Min)

Design & Manufacturing Of Electrical Switchgear's

ASACO CO.
Tehran , Tehran
2008.11 - 2019.03

Project Managing

Designing & Manufacturing involves :
Indoor withdrawable air-insulated Metal-Clad (Type NGT4)
Indoor Fixed air-insulated metal enclosed
Indoor withdrawable air-insulated Metal-Clad (NMW-12)
Indoor withdrawable air-insulated Metal-Clad (HMS-36 KV)
Outdoor/Indoor Compact Distribution Substation
Withdrawable Motor Control Center SWGR Panel
Withdrawable Power Center SWGR Panel
Modular Plug-in Type MCC SWGR Panel
Protection Control Panel
Reactive Power Compensation SWGR Panel
Outdoor and wall mounting utility Panel
Low Voltage Compact Bus Duct

Education

Bachelor of Science - Power Electrical Engineer

Azad Univercity
Tehran -IRAN
1995.11 - 2000.01

Skills

Design of power distribution and control circuits

undefined

Software

Autocad Electrical

Eplan

Office

Guitar player

Playing guitar has been my first hobby for over 30 years

Timeline

(FAT) TEST of Electrical Switchgear Panels

INFOWARE ZRT. Ministry Of Electricity KUWAIT Proj.
2024.02 - 2024.02

(FAT) TEST MV Electrical Switchgear Panels

KKS-SICIM LLP-Project (KEP1) Schneider Electric
2024.01 - 2024.01

(FAT) Schneider Elec. PROCEDURE FOR LV BUSDUCt

QATAR GAS EPC For North Field Production Sustaina
2024.01 - 2024.01

Design & Manufacturing Of Electrical Switchgear's

ASACO CO.
2008.11 - 2019.03

Bachelor of Science - Power Electrical Engineer

Azad Univercity
1995.11 - 2000.01
Farzad JafarpourElectrical Engineer